Previous
EVM 20 Inch 195 Grand HD LED Monitor With HDMI | VGA

EVM 20 Inch 195 Grand HD LED Monitor With HDMI | VGA

Original price was: ₹9,000.00.Current price is: ₹2,800.00.
Next

EVM 21.5 Inch FHD Curved LED Monitor With HDMI | VGA And Speaker (160 Plasma LED)

Original price was: ₹18,000.00.Current price is: ₹5,399.00.
EVM 21.5 Inch FHD Curved LED Monitor With HDMI | VGA And Speaker (160 Plasma LED)

EVM 24 Inch 240 Grand HD LED Monitor With HDMI | VGA

Original price was: ₹11,000.00.Current price is: ₹4,200.00.

Total price you see is inclusive of the product price, taxes Charges

  • Model: EVM 240 Grand LED
  • Warranty: 1 Years From EVM Service Center
  • Product URL: View Product
Add to Wishlist
Add to Wishlist
: Category: Brand:

Description

Model 24-inch Monitor
Panel A Grade
Viewing Angle Horizontal: 176º, Vertical: 176º
Max Brightness 400 cd/m²
Max Contrast Ratio 1000:1 (Typical)
Port VGA + HDMI
Response Time 8 ms
Resolution 1920 × 1080 HZ
Display Colour 16.7 Million
Power Consumption < 20W
Stand-by Power ≤ 3W / ≤ 1W
Monitor Size 24 inch
VESA Mount 100 × 100 mm

Reviews

There are no reviews yet.

Be the first to review “EVM 24 Inch 240 Grand HD LED Monitor With HDMI | VGA”

Your email address will not be published. Required fields are marked *